The first install of the wings took place Saturday 3/28. Don, Dave, Danny and Mary where there to help. All went great. The wings went on without any trouble and all the specs were met easily. We also checked the fuel floats range, installed the shear brackets, started on the fairing for the wings and were able to determine stick height needed. Great day and big step toward first flight.